Structures - Furniture Factory

These pages document my attempt at creating a furniture factory diorama. The final overall photos of the diorama's structures are shown here. Construction progress is fully documented on the pages listed below. The dates indicate the last time the page was updated with new content.

Click on images here for a larger view ----->

Main Factory Building: October 19, 2006 - December 18, 2006

  1.Base and Wall Construction11-07-2006
  2.Creating Door Openings10-31-2006
  3.Creating Floors and Roof10-24-2006
  4.Painting Exterior Walls11-06-2006
  5.Installing Glass11-06-2006
  6.Lower-level Interior11-09-2006
  7.Remaining Interior and Lights11-15-2006
  8.The Roof11-18-2006
  9.Loading Platform12-18-2006

Lumber Storage Shed: December 19, 2006 - January 20, 2007

10.Structure Design12-19-2006
11.Base Platform12-23-2006
12.Side Walls01-08-2007
13.Interior Racks01-08-2007
14.Rear Wall01-14-2007
15.Lumber01-15-2007
16.Walkway01-18-2007
17.The Roof01-20-2007

Diorama: January 28, 2007 - February 18, 2007

18.Ground Cover01-28-2007
19.Fence01-31-2007
20.Grasses & Bushes02-13-2007
21.Vehicles02-18-2007